In determining the acceptable time period for the resumption of critical business processes: 
A、only downtime costs need to be considered. 
B、recovery operations should be analyzed. 
C、both downtime costs and recovery costs need to be evaluated. 
D、indirect downtime costs should be ignored. 
							
